July 26, 2021 The main units have been delivered and fit through the doors to the Boiler Room. The copper piping has been delivered. July 28, 2021 Reworking the piping and other set up. August 2, 2021 Hot water heater units in place on flood pad. The piping is laid out to ensure all pieces are correct and to the proper code. For example, the yellow handled shut off valves shown at the bottom of the picture are not the correct ones and will be replaced (good catch by John the installer from NPI). August 3, 2021 Hot Water Heater #1 being assembled. Notice the small level on the horizontal run that is perpendicular to the wall. There are a lot of codes to follow in plumbing. More hardware install that includes Hot Water Heater #2. August 5, 2021 The gas line was added. It is the black pipe in the middle of the photo that leads to the black control box at the base of Water Heater #1. A major shut off valve will be added soon and e...