Interactive Touch Screen Panels at WPS 2021

 Woodman Park Elementary School would like to thank those that made the Newline Interactive Touch Screen Panels a reality.  The Trafera company and installers of Shane, Rodney, and Daniel were fantastic to work with on this project.  Christy Prosser and her IT staff were supportive, dedicated, and hard working as always.  And thank you Business Administrator Michael Limanni for also making the behind the scenes actions result in many great educational tools in our school community. 

Panels Delivered: July 29, 2021

51 Panels Delivered to the Gym by Sam Shearer and Kelly Parker.


Close up of the box


Install on the WPS Middle Floor: August 1, 2021

Shane is drilling holes marked from a leveled template


Inserting several anchors into the wall.


Bracket mounted/screwed into wall while leveled. 


Panel being placed on the bracket. 


Screen being screwed to the bracket. 


After some 'raceway' work is done to secure the data wire and power cord (not explicitly shown) the Interactive Touch Screen Panel is ready to go!


Install on the WPS Bottom Floor: August 2, 2021

Room 014 has a panel installed that is centered as much as possible on the wall and close to an electrical outlet and data drop (white raceway).  Some White Board space was available as well. 


Install on the WPS Top Floor: August 3, 2021

Top Floor being completed today.  Installers from left to right, Rodney, Shane, and Daniel.  They came from West Virginia to NH to complete this project. 


Comments

Popular posts from this blog

WPS Paving Project 7-26-2021 to 8/??/2021

  DAY ONE, July 26, 2021 A special thanks to R&D Paving out of Franklin, NH for their work and expertise for this paving project.  Jeff Twarog and others from this company were great about communicating and answering questions during the entire project.  C&W Services and Dover School District Facilities Director Michael Brooks and Dover School District Business Administrator Michael Limanni were also instrumental in making this project happen during all of its phases. To all of the previously mentioned and the other sub-contractors, thank you from Woodman Park School. "The Reclaimer"  This machine scrapes the pavement and tills it into the ground material underneath. This Pad Foot Roller compresses and dimples the base before adding stone.   The Reclaimer is tilling/grinding in stones to make a more firm base before the pavement is added. The "Gas Station/Lower Foyer" parking lot is being worked on as well. DAY TWO, July 27, 2021 Bus Loop by the Ten...

WPS Staff Northeast Passage Wheelchair Handball Game: March 24, 2022

  WPS Staff Northeast Passage Wheelchair Handball Game March 24, 2022

WPS Hot Water Heater Work 7-26-2021 to 8/?/2021

 July 26, 2021 The main units have been delivered and fit through the doors to the Boiler Room.  The copper piping has been delivered. July 28, 2021 Reworking the piping and other set up.   August 2, 2021 Hot water heater units in place on flood pad. The piping is laid out to ensure all pieces are correct and to the proper code.  For example, the yellow handled shut off valves shown at the bottom of the picture are not the correct ones and will be replaced (good catch by John the installer from NPI). August 3, 2021 Hot Water Heater #1 being assembled.  Notice the small level on the horizontal run that is perpendicular to the wall.   There are a lot of codes to follow in plumbing.  More hardware install that includes Hot Water Heater #2. August 5, 2021 The gas line was added.  It is the black pipe in the middle of the photo that leads to the black control box at the base of Water Heater #1.  A major shut off valve will be added soon and e...